IPC 9592B:2012 | IPC 9592A:2010 | 備註 |
5.1 Design Verification Testing (DVT) | 5.1 Design Verification Testing (DVT) | |
5.1.6 Design Verification Testing - AC Input Parameters | 5.1.6 Design Verification Testing - AC Input Parameters | |
5.1.7 Design Verification Testing - DC Input Parameters | 5.1.7 Design Verification Testing - DC Input Parameters | |
5.1.8 Design Verification Testing - Overall Input to Output Parameters | 5.1.8 Design Verification Testing - Overall Input to Output Parameters | |
5.1.9 Design Verification Testing - DC Output Parameters | 5.1.9 Design Verification Testing - DC Output Parameters | |
5.1.10 Design Verification Testing - Protection Features | 5.1.10 Design Verification Testing - Protection Features | |
5.1.11 Design Verification Testing - Input and Output Signals and Indicators | 5.1.11 Design Verification Testing - Input and Output Signals and Indicators | |
5.1.12 Design Verification Testing - Other Electrical Parameters, Features and Functions | 5.1.12 Design Verification Testing - Other Electrical Parameters, Features and Functions | |
5.1.13 Design Verification Testing - Hot Swap | 5.1.12.2 Design Verification Testing - Hot Swap | |
5.1.14 Design Verification Testing - Mechanical Compliance | 5.1.13 Design Verification Testing - Mechanical Compliance | |
5.2 Environmental Stress Testing (EST) | 5.2 Environmental Stress Testing (EST) | |
5.2.3 Highly Accelerated Life Test (HALT) | 5.2.3 Highly Accelerated Life Test (HALT) | |
5.2.4 Temperature, Humidity and Bias (THB) | 5.2.4 Temperature, Humidity and Bias (THB) | |
5.2.5 High Temperature Operating Bias (HTOB) | 5.2.5 High Temperature Operating Bias (HTOB) | |
5.2.6 Temperature Cycling Test | 5.2.6 Temperature Cycling Test | |
5.2.7 Power and Temperature Cycling (PTC) Test | 5.2.7 Power and Temperature Cycling (PTC) Test | |
5.2.8 Shock and Vibration | 5.2.8 Shock and Vibration | |
5.2.9 Random Vibration - Operating | 5.2.9 Random Vibration - Operating | |
5.2.10 Random Vibration - Non-Operating | 5.2.10 Random Vibration - Nonoperating | |
5.2.11 Shock - Operating | 5.2.11 Shock - Operating | |
5.2.12 Free Fall | 5.2.12 Free Fall | |
5.2.13 Drop Test | 5.2.13 Drop Test | |
5.2.14 Other Environmental Stress Testing | 5.2.14 Other Environmental Stress Testing | |
5.2.14.1 Corrosion Resistance | 5.2.14.1 Corrosion Resistance | |
5.2.14.2 Dust Resistance | 5.2.14.2 Dust Resistance | |
5.2.14.3 SMT Attachment Reliability | 5.2.14.3 SMT Attachment Reliability | |
5.2.14.4 Through Hole Pin Solderability | 5.2.14.4 Through Hole Pin Solderability | |
5.3 Electromagnetic Susceptability (EMS) and Other Tests | 5.3 Electromagnetic Susceptability (EMS) and Other Tests | |
5.3.1 Conducted Continuous Wave | 5.3.1 Conducted Continuous Wave | |
5.3.2 Radiated Immunity | 5.3.2 Radiated Immunity | |
5.3.3 Conducted Electrical Fast Transient (EFT) | 5.3.3 Conducted Electrical Fast Transient (EFT) | |
5.3.4 Conducted Surges | 5.3.4 Conducted Surges | |
5.3.5 Ring Waves | 5.3.5 Ring Waves | |
5.3.6 Electrostatic Discharge - Packaged Power Devices | 5.3.6 Electrostatic Discharge - Packaged Power Devices | |
5.3.7 Electrostatic Discharge - Board Mounted Power Devices | 5.3.7 Electrostatic Discharge - Board Mounted Power Devices | |
5.3.8 Power Line Disturbance Immunity - AC Input | 5.3.8 Power Line Disturbance Immunity | |
5.3.9 Electromagnetic Emmissions | 5.3.9 Electromagnetic Emmissions | |
5.3.10 Acoustic Noise | 5.3.10 Acoustic Noise | |
5.3.11 Product Safety | 5.3.11 Product Safety | |
5.3.12 Regulatory "Green" | 5.3.12 Regulatory "Green" | |
| | |
| | |
IPC 9592B:2012 | IPC 9592A:2010 | 備註 |
6. Quality Processes | 6. Quality Processes | |
6.1 Quality Management Systems | 6.1 Quality Management Systems | |
6.1.1 Process Failure Modes and Effects Analysis (PFMEA) | 6.1.1 Process Failure Modes and Effects Analysis (PFMEA) | |
6.1.2 Statistical Process Control | 6.1.2 Statistical Process Control | |
6.1.3 Process Capability Assessment | 6.1.3 Process Capability Assessment | |
6.1.4 Measurement Capability Assessment | 6.1.4 Measurement Capability Assessment | |
6.1.5 Corrective Action Process | 6.1.5 Corrective Action Process | |
6.1.6 Calibration | 6.1.6 Calibration | |
6.1.7 Continuous Improvement | 6.1.7 Continuous Improvement | |
6.1.8 Process Quality Metrics | 6.1.8 Process Quality Metrics | |
6.2 Sub-Tier Supplier | 6.2 Sub-Tier Supplier | |
6.3 Materiala Traceability Requirements | 6.3 Materiala Traceability Requirements | |
6.4 Change Authorization | 6.4 Change Authorization | |
6.5 Qualification of Change | 6.5 Qualification of Change | |
| | |
| | |
IPC 9592B:2012 | IPC 9592A:2010 | 備註 |
7 Manufacturing Conformance Testing | 7 Manufacturing Conformance Testing | |
7.1 Manufacturing Conformance Tests | 7.1 Manufacturing Conformance Tests | |
7.2 Early Manufacturing Conformance Test Requirements | 7.2 Early Manufacturing Conformance Test Requirements | |
7.3 Final Assembly Test Requirements | 7.3 Final Assembly Test Requirements | |
7.3.1 Functional Tests | 7.3.1 Functional Tests | |
7.3.2 Stress Tests (Short Term Reliability Tests - BI/HASS) | 7.3.2 Stress Tests (Short Term Reliability Tests - BI/HASS) | |
7.3.3 Ongoing Reliability Testing (ORT) | 7.3.3 Ongoing Reliability Testing (ORT) | |
7.3.4 Safety Tests | 7.3.4 Safety Tests | |
7.3.5 Final QA Cosmetic / Mechanical Audit | 7.3.5 Final QA Cosmetic / Mechanical Audit | |
7.3.5.1 QA Out of Box Audit (OBA) | 7.3.5.1 QA Out of Box Audit (OBA) | |
| | |
| | |
| | |
| | |
| | |
| | |